Thu 19 Dec, 2013 01:33 am - Which would you prefer:
1 For BOM and assembling and welding requirements, see drawing...
2 For BOM, assembling requirements and welding requirements, see drawing...
3 For BOM, assembling, and... (view)
Wed 18 Dec, 2013 09:59 am - Hi,
I was reviewing a drawing at work and I reacted to this sentence:
For bill of material, assembling and welding requirement, see drawing....
Since it should be read as assembling requirements... (view)