Reply
Tue 1 Aug, 2017 12:02 am
Determine the appropriate pill volume requirements. In most scenarios, a pill volume of 100 bbls should be considered sufficient and minimum. In large well bores, and in situations where the loss is extreme or total, a greater pill volume is recommended.